Introduction
Doing more with Primavera P6
()
Download and install Primavera P6
()
Download and install free project layouts
()
1. Advanced "Essential" Features
Refresh data: F5
()
Schedule project: F9
()
Data date
()
Running reports
()
Free float vs. Total float
()
Group and sort
()
Resolving negative float
()
Fill Down
()
Expected Finish
()
Activity Network
()
Trace Logic
()
Adjusting resource units
()
Adjusting expenses units
()
2. Advanced Primavera P6 Scheduling
Converting a baseline to a project
()
Converting a project to a baseline
()
Updating the project baseline
()
Activity usage spreadsheet
()
Resource Usage spreadsheet
()
Resource histograms and S-Curves
()
Activity histograms and S-Curves
()
Earned value s-curves
()
Leveling resources
()
Activity codes
()
User defined fields (UDFs)
()
Global changes
()
Opening multiple projects
()
Set a default project for multiple projects
()
Setting baselines for multiple projects
()
Calculating multiple float paths
()
Displaying multiple float paths
()
Performance measurement baseline
()
Create financial periods
()
Store period performance
()
Timescaled logic diagram
()
Schedule comparison in visualizer
()
Ex_Files_Layouts.zip
(121 KB)